CASE STUDY · Corporate Website / Renewable Energy / Infrastructure / WordPress

EVB Group

Big infrastructure. A fitting presence.

A premium corporate website built for a renewable energy infrastructure group active across solar PV, hybrid systems, agrivoltaics, BESS and project development.

Project delivered by SIMION SYSTEMS, under the direct coordination of .

WordPress • Elementor • Corporate Website • Renewable Energy • Infrastructure • Launch Support

Project overview

The solution at a glance.

Explore the project’s structure, implementation and delivered work.

EVB Group — desktop website screenshot EVB Group — mobile website screenshot
Open live website ↗evb-group.com

Concrete problem

EVB Group needed a serious, premium English-language corporate website that positioned the group as active in renewable infrastructure, not as a local residential solar panel installer. The main challenge was to avoid the common solar installer look and create a presentation suitable for large-scale opportunities, development, infrastructure, partnerships and capital.

What changed concretely

I rebuilt the website structure, copy and design around EVB Group’s renewable energy infrastructure business. Dedicated pages cover solar PV, hybrid systems, agrivoltaics and data centre infrastructure, alongside project development, construction, operations, maintenance and repowering services.

What we delivered

Corporate website design and implementation, WordPress / Elementor development, website structure and page architecture, corporate copy adaptation in English, solutions and services pages, contact form implementation, mobile responsive setup, basic SEO structure and launch support.

Website structure

The final structure includes Home, About, Solutions, Services, Projects, News, Careers, Contact and Privacy Policy, plus dedicated pages for the 4 solutions and 5 services. The homepage presents EVB Group in renewable energy development across Europe and uses the figures confirmed for the project content: 300+ MWp installed capacity, 200 MWh BESS and 400 MW pipeline. The figures are supplied for the project content; they are not outcomes attributed to SIMION SYSTEMS.

Project outcome

EVB Group has a corporate website on evb-group.com, with dedicated pages for its solutions, services and group companies. The English-language presentation supports discussions about infrastructure projects and partnerships.

YOUR NEXT PROJECT

What would you like to build?

Tell me what you want to launch or improve. We’ll work out the right place to start.